Changelog — Capability Boundary
Frozen Baseline discipline. Material changes only.
Version 1.0
Published: 2026-03-09
- Initial structural baseline publication.
- Definition of capability boundary formalized as a jurisdiction-neutral structural limitation concept.
- Scope boundary (included / excluded) established.
- Four-phase transition model introduced.
- Mandatory legal, privacy, and terms pages implemented.
- 2026-05-17 — Added root-level llms.txt reference file.
- 2026-07-22 — Updated root-level llms.txt to LLMS Baseline v2.0 to align with the current frozen machine-readable reference structure.
- 2026-09-25 — Removed the email property from Organization JSON-LD on the remaining affected pages to align the implementation with the established portfolio governance baseline. Frontend contact information remains unchanged. No change to the domain’s semantic definition, scope, or structural model.
Status: Frozen Baseline
Change Policy
Changes are recorded only if:
- The definitional boundary materially evolves.
- A structural clarification modifies conceptual framing.
- Source anchoring or structural reference logic materially changes.
- A compliance-relevant correction is required for accuracy.
Minor editorial or formatting corrections are not versioned.
Versioning Logic
- Major increment — Structural or definitional shift.
- Minor increment — Material clarification without definitional change.
- No increment — Editorial refinement only.